Annex 10 (contd..)
Preventive Maintenance Schedule for Protection Systems
|
S. No. |
Tasks assigned |
Shut Down (SD) Or Without Shut Down (WSD) |
Periodicity |
|
|
PLCC SYSTEM |
|
|
|
|
Power supply measurements |
SD |
Yearly |
|
|
Transmitter checks |
SD |
Yearly |
|
|
Receiver checks |
SD |
Yearly |
|
|
Checks for Alarms |
SD |
Yearly |
|
|
Reflex test |
SD |
Yearly |
|
|
BUS BAR PROTECTION |
|
|
|
|
Primary injection test |
SD |
As per requirement |
|
|
Protection stability and sensitivity checks (To be done whenever the protection AC circuits are disturbed like addition of new feeder |
SD |
As per requirement |
*Includes Z1, Z2, Z3 and Z3 (reverse)
**Includes Z1, Z2, Z3 and Z3 (reverse)
Note: The tests listed under (A) and (B) above may be carried out with out a Line SD ensuring
i) Proper isolation of the relay under test
ii) The Other Main Protection of the Line is healthy and is in service