Annex 10

Preventive Maintenance Schedule for Protection Systems

S. No.

Tasks assigned

Shut Down (SD) Or Without Shut Down (WSD)

Periodicity

a.

Testing of DR/EL

WSD

Monthly

b.

Calibration of panel meters (Indicating/Recording instruments along with the transducers)

WSD

Yearly

c.

Calibration of Non-Tariff Energy meters

WSD

Yearly

d.

Calibration of Tariff Energy Meters

 

 

e.

Secondary Injection Test of individual protection schemes

SD

Yearly

f.

Checking of Voltage (in service) for relays

WSD

Yearly

g.

Checking of DC drain of static relays

WSD

Yearly

h.

Checking of DC drain of static relays

WSD

Yearly

I.

LINE PROTECTION

 

 

A.

DISTANCE PROTECTION

 

 

 

MICROMHO

 

 

 

Reach check for all 4 zones*

WSD

Yearly

 

Time measurement

WSD

Yearly

 

Power swing blocking check

WSD

Yearly

 

SOTF

WSD

Yearly

 

Level detectors of pps

WSD

Yearly

 

Fuse failure check

WSD

Yearly

 

Polarization check

WSD

Yearly

 

Nps detector check

WSD

Yearly

 

YTG

 

 

 

Reach check for all 4 zones**

WSD

Yearly

 

Timing check for the same

WSD

Yearly

 

PSB check

WSD

Yearly

 

DC Supply monitoring

WSD

Yearly

 

VT fuse failure check

WSD

Yearly

 

RAZFE

 

 

 

Reach check for all 4 zones**

WSD

Yearly

 

Timing check for the same

WSD

Yearly

 

PSB check

WSD

Yearly

 

VT fuse failure check

WSD

Yearly

 

LZ 96

 

 

 

Reach check for all 4 zones**

WSD

Yearly

 

Timing check for the same

WSD

Yearly

 

PSB check

WSD

Yearly

 

Opto coupler inputs check

 

 

 

Self diagnostic signals check

 

 

 

SOTF check

 

 

 

VT fuse failure check

WSD

Yearly

 

THF Reyrolle

 

 

 

Reach check for all 4 zones**

WSD

Yearly

 

Timing check for the same

WSD

Yearly

 

PSB check

WSD

Yearly

 

SOTF check

 

 

 

VT fuse failure check

WSD

Yearly