Annex 10
Preventive Maintenance Schedule for Protection Systems
|
S. No. |
Tasks assigned |
Shut Down (SD) Or Without Shut Down (WSD) |
Periodicity |
|
a. |
Testing of DR/EL |
WSD |
Monthly |
|
b. |
Calibration of panel meters (Indicating/Recording instruments along with the transducers) |
WSD |
Yearly |
|
c. |
Calibration of Non-Tariff Energy meters |
WSD |
Yearly |
|
d. |
Calibration of Tariff Energy Meters |
|
|
|
e. |
Secondary Injection Test of individual protection schemes |
SD |
Yearly |
|
f. |
Checking of Voltage (in service) for relays |
WSD |
Yearly |
|
g. |
Checking of DC drain of static relays |
WSD |
Yearly |
|
h. |
Checking of DC drain of static relays |
WSD |
Yearly |
|
I. |
LINE PROTECTION |
|
|
|
A. |
DISTANCE PROTECTION |
|
|
|
|
MICROMHO |
|
|
|
|
Reach check for all 4 zones* |
WSD |
Yearly |
|
|
Time measurement |
WSD |
Yearly |
|
|
Power swing blocking check |
WSD |
Yearly |
|
|
SOTF |
WSD |
Yearly |
|
|
Level detectors of pps |
WSD |
Yearly |
|
|
Fuse failure check |
WSD |
Yearly |
|
|
Polarization check |
WSD |
Yearly |
|
|
Nps detector check |
WSD |
Yearly |
|
|
YTG |
|
|
|
|
Reach check for all 4 zones** |
WSD |
Yearly |
|
|
Timing check for the same |
WSD |
Yearly |
|
|
PSB check |
WSD |
Yearly |
|
|
DC Supply monitoring |
WSD |
Yearly |
|
|
VT fuse failure check |
WSD |
Yearly |
|
|
RAZFE |
|
|
|
|
Reach check for all 4 zones** |
WSD |
Yearly |
|
|
Timing check for the same |
WSD |
Yearly |
|
|
PSB check |
WSD |
Yearly |
|
|
VT fuse failure check |
WSD |
Yearly |
|
|
LZ 96 |
|
|
|
|
Reach check for all 4 zones** |
WSD |
Yearly |
|
|
Timing check for the same |
WSD |
Yearly |
|
|
PSB check |
WSD |
Yearly |
|
|
Opto coupler inputs check |
|
|
|
|
Self diagnostic signals check |
|
|
|
|
SOTF check |
|
|
|
|
VT fuse failure check |
WSD |
Yearly |
|
|
THF Reyrolle |
|
|
|
|
Reach check for all 4 zones** |
WSD |
Yearly |
|
|
Timing check for the same |
WSD |
Yearly |
|
|
PSB check |
WSD |
Yearly |
|
|
SOTF check |
|
|
|
|
VT fuse failure check |
WSD |
Yearly |